ettlementinShieldTunneling,”[C].Proc.Ofthe10thInt’lConf.onSoilMechanicsandFoundationEngineering,Vol.1,Stockholm,pp.357~360,1981
[3] E.H.Davis,M.J.Gunn,R.J.Mair,andH.N.Senevi ratne,“Thestabilityofshallowtunnelsandundergroundopeningsincohesivematerial.”[J].Geotetechnical,30(4):397-416,1980
[4] G.AnagnostouandK.Kovarl[J].“TunelingandUnderg roundSpaceTechnology,”Vol.11,No.2.165~173,1996
[5] 程展林,吴忠明,徐言勇.砂基中泥浆盾构法隧道施工开挖面稳定性试验研究[R].长江科学院院报,Vol.18,No.5,2001
[6] PierreChambonChambon,“Shallowtunnelsincohesionlesssoil:Stabilityoftunnelface,”[J].JournalofGeotechnicalEngineering,Vol.120,No.7,1994
[7] 王敏强,陈宏胜.盾构推进隧道结构三维非线性有限元仿真[J].岩石力学及工程学报,Vol.21,No.2,2002
[8] P.deBuhan,A.Cuvillier,L.Dormieux,andS.Mag hous,“Facestabilityofshallowcirculartunnelsdrivenun derthewatertable:Anumericalanalysis,”[J].Interna tionalJournalforNumericalandAnalyticalMethodsinGeo mechanics,23:79~95,1999
[9] 朱伟,陈仁俊.盾构隧道施工技术现状及展望(第3讲)[J].GeotechnicalEngineeringWorldVol.5.No.1,2001 上一页 [1] [2] [3]
|